From Raw Coil to Finished Specification: Our Three Production Lines
Three dedicated lines — colour coating, film laminating, and precision slitting. Here's exactly what each one does, what it produces, and what that means for your specification.
Three Lines at a Glance
From raw substrate to finished coil — every step in sequence
What Each Line Does — and What It Means for Your Order
Equipment specs matter less than what they enable. For each line, we explain the capability and the direct implication for buyers.
Continuous roller coating + dual oven cure. Raw GI and GL substrate becomes PPGI and PPGL coil ready for your fabrication.
- All four coating systems on one line — PE, SMP, HDP, and PVDF. No separate line changeover fee. You are not locked into a minimum per coating type beyond the standard 5T MOQ.
- Automated ΔE and DFT monitoring — colour difference and dry film thickness measured continuously during production, not just spot-checked. Batch consistency ΔE ≤ 1.0 guaranteed.
- 2/1 coat pass available for sandwich panel skins — the correct specification for PU foam adhesion. Not all coating lines offer this; specify at order placement.
- Back coat specified separately — epoxy-grade back coat for sandwich panel skins; standard polyester for all other uses. Must be declared at order stage.
Pressure-bond PVC, PET, or PVDF film onto pre-coated steel substrate — odour-free food liners, VHP-resistant cleanroom panels, woodgrain appliance faces.
- Food-grade PVC film (FDA 21 CFR / EU 10/2011 / GB 9685) — inner liner grade for cold room walls, wine cooler interiors, and food processing surfaces. "No-odour" formulation available; must be specified.
- PVDF film for GMP B cleanrooms — VHP-resistant, Ra ≤ 0.5μm. Different from PVDF baked coating — confirm which is required for your application.
- Custom print patterns — woodgrain, marble, brushed-metal decorative VCM for appliance faces. Allow 10–15 working days for colour development and trial approval before production starts.
- EGI substrate recommended for thin decorative films — substrate surface texture can print through on films below 80μm. We flag this at spec confirmation; EGI adds a small premium.
✂️
Replace with slitting line image — landscape recommended
Master coil (up to 1,250mm) cut to your exact specified width. Runs on both colour coated and laminated master coils, adding just 2–3 days to completion.
- Non-standard widths at no premium — if your roll-forming or press tooling requires an exact width not available in standard master coil, slitting delivers it. Minimum 100mm, tolerance ±1mm.
- Works on coated and laminated coil — slit after coating or after film lamination. Edge condition is clean and burr-free; no edge delamination on VCM if film extends to the slit edge.
- Does not reset the production lead time — slitting is scheduled immediately after master coil completion. The 2–3 days is additive to coating or laminating, not a separate queue.
- Multiple widths from one master coil — if your order needs two or three different widths of the same spec, we slit all in one pass. Batch colour is guaranteed identical across all widths.
Your Order's Path Through the Factory
Most orders use one or two lines. Understanding which lines your order goes through tells you exactly where the production time is spent — and what can be expedited.
Coating Line only
Coating + Laminating
Coating + Slitting (or Lam + Slitting)
1. PVDF coating requires a longer oven temperature profile than PE/SMP/HDP. This doesn't add days to the lead time but does affect which production slot your order goes into. Confirm at order placement so we can schedule correctly. 2. Custom VCM print patterns need a colour development and approval cycle before production starts. The 10–15 working days for this runs in parallel with contract preparation — not after it — so inform us of the pattern requirement at enquiry stage, not at order confirmation.
What Gets Checked at Each Stage
Line output quality is controlled at three points — incoming substrate, in-process monitoring, and final OQC before dispatch. Here's what that means in practice for each line.
Questions About Our Production Lines
Can you coat and laminate in the same order — for example, outer shell PPGI and inner liner VCM?
What is the difference between 2/1 and 2/2 coat pass — and does it matter for my order?
Can I order the same specification at different widths and get matching colour across all widths?
Do you offer cut-to-length sheets, or only coils?
Can I visit the factory or request a video audit of the production lines?
Not Sure Which Line Handles Your Specification?
Tell us your end use and the surface position. We'll confirm which lines are involved, the correct specification for each, and the realistic production lead time — in writing, before you commit to an order.
- Specification confirmation in writing within 24 hours
- Production path (which lines, in which order) stated clearly
- Back coat and coat-pass system confirmed per end use
- MTC + OQC report with every shipment, every line
- Factory audit or video call available within 5 working days