Quality Control for Pre-Painted & Laminated Steel
End-to-end assurance from incoming raw material to outgoing shipment — with full MTC traceability, SGS-verified test reports, and audit-ready documentation on every order.
Quality System Flow
End-to-End Quality Control System
Every order passes through five structured control stages. Each stage has defined test methods, acceptance criteria, and documented outputs — available to customers on request.
What You Receive With Each Shipment
The most common question from procurement teams: what documents come with the cargo? Below is the standard set — every item is issued per production batch, not per container.
We welcome third-party pre-shipment inspection by SGS, Bureau Veritas, TÜV, or any customer-nominated agency. Please arrange at least 7 days before the scheduled shipment date. Our team provides full cooperation and assists with on-site scheduling at no additional charge.
How We Test — and What We Accept
All OQC tests follow EN 10169 and GB/T 12754 as primary references. SGS-verified results are available per batch. The table below lists the standard acceptance criteria for export PPGI/PPGL coil.
| Test Item | Test Method | Acceptance Criteria | Applies To |
|---|---|---|---|
| Dry Film Thickness (DFT) | EN ISO 2808 / ASTM D7091 | Top coat ± 2 μm of specified value | All coating systems |
| Colour Difference (ΔE) | CIE Lab, D65 illuminant | ΔE ≤ 1.0 vs. approved colour chip | All coating systems |
| Gloss Level | EN ISO 2813 (60°) | Within ± 5 GU of specified value | All coating systems |
| T-Bend Adhesion | EN ISO 1519 / ASTM D4145 | No cracking: 0T–1T (PE); 1T–2T (SMP/HDP); 1T–3T (PVDF) | All coating systems |
| Cross-Cut Adhesion | EN ISO 2409 | Grade 0 or Grade 1 | All coating systems |
| Pencil Hardness | ASTM D3363 | H to 2H (no film removal) | All coating systems |
| MEK Rub Resistance | ASTM D5402 | ≥ 100 double rubs (no film removal) | All coating systems |
| Salt Spray Resistance | EN ISO 9227 (NSS) | PE: 300–500h; SMP: 500–1,000h; HDP: 750–1,000h; PVDF: 1,000–1,500h+ | Per coating system |
| Zinc Coating Weight | EN ISO 1460 / GB/T 1839 | Within ± 5% of specified Z or AZ value | GI and GL substrates |
| Steel Thickness | EN 10131 / EN 10143 | Within standard thickness tolerance | All substrates |
Full Traceability From Coil to Customer
Every coil is assigned a unique batch number at production that links all of the following records. If a quality issue arises after delivery, we can retrieve the complete production record for any coil within one business day.
ECN Workflow
Any change to product specification, raw material source, or production process requires a documented ECN before implementation. Customers affected by a specification change are notified before the change goes into production.
How We Handle Problems When They Occur
No manufacturing process is perfect. What matters is how quickly and systematically problems are identified and resolved. These are two real examples from our complaint records.
Inconsistent Colour Across Panels
Back Coat Delamination After Forming
Audit-Ready Compliance Documentation
All certification documents and third-party test reports are available for submission to specifiers, architects, and building authorities.
ISO 9001:2015 — Quality Management System
Covers the full manufacturing chain from incoming coil to finished PPGI/PPGL dispatch. Scope includes pre-treatment, coating, slitting, and packing. Surveillance audit annually.
- Issued by TÜV SÜD — available on request
- Scope includes pre-painted and laminated steel coil production
- Internal audits conducted quarterly
SGS Third-Party Testing
Independent mechanical and chemical testing by SGS on production batches. Reports cover salt spray, T-Bend, DFT, colour, adhesion, and MEK rub. Issued per batch, not per shipment.
- Available per production batch on customer request
- Accepted by EU, US, Middle East, and Australian specifiers
- Reports reference EN 10169 and ASTM test methods
Industry Standards Compliance
Common Questions About Our QC Process
What AQL standard do you use, and what inspection level?
Can I request third-party inspection before shipment?
What documents are included as standard with every shipment?
How do you ensure colour consistency across a large order?
How quickly do you respond to complaints, and what is the process?
How long do you retain quality records?
Get the QC Pack for Your Next Order
Tell us your product specification and intended application. We'll confirm which documents are available as standard and which require advance notice — and respond within one business day.
- MTC and OQC report issued with every shipment — no extra charge
- SGS third-party reports available per batch on request
- Third-party pre-shipment inspection fully supported
- 8D complaint closure within 5 business days
- All records retained and retrievable for audit